Warehousing, Logistics & Material Handling

Hellmann and Exotec to automate Siemens Nuremberg site warehouse

Marek DvorakNovember 26, 20265 min read0 views

At a glance

  • The logistics provider will deploy an autonomous storage and picking system at Siemens Smart Infrastructure Buildings’ Nuremberg site, starting with around 35,000 storage locations.
  • Hellmann Worldwide Logistics is partnering with Exotec to automate storage, order fulfilment and material movement at Siemens’ Nuremberg site. The system is scheduled to go live in mid-2027 with about 35,000 storage locations and scope to scale.
Autonomous robots carry totes through a generic automated warehouse, with storage racks and picking stations arranged for scalable order fulfilment.

Hellmann Worldwide Logistics is working with warehouse automation specialist Exotec to introduce an intelligent robotics system at Siemens Smart Infrastructure Buildings’ Nuremberg site. The partners plan to automate storage, order fulfilment and the movement of materials within the facility.

Hellmann has operated the Nuremberg warehouse as a full-service logistics provider for Siemens Smart Infrastructure Buildings since 2025. The new automation is intended to add capacity for anticipated growth while improving efficiency, quality and space utilisation.

The system is scheduled to go live in mid-2027. It will use autonomous robots to store and retrieve goods and to transport totes to picking stations. Initially, it will provide around 35,000 storage locations, with the design allowing capacity to expand as demand increases.

The system is designed so that storage capacity and picking stations can be added flexibly and with minimal effort. That modular approach is meant to support expected annual increases in volumes at the site.

Daniel Schnuck, director of global warehouse at Siemens Smart Infrastructure, said the automation solution is intended to create a foundation for future growth, continuous operational improvement and a consistently flexible, high level of service for customers over the long term.

The Nuremberg site is part of Siemens Smart Infrastructure Buildings’ operations. Siemens describes such smart buildings as able to manage their own energy demand and generation through bidirectional energy flows between on-site generation and storage systems and the external electricity grid, helping to reduce energy waste and greenhouse gas emissions.

Reported by Marek Dvorak, Commercial Vehicle Specialist.