Building Materials & Real Estate

Helix Construct administration leaves £4.8m owed to suppliers

Luciana FerreiraNovember 19, 20265 min read3 views

At a glance

  • Administrator KR8 Advisory details £4.8m owed to suppliers, £2.3m to lenders and £260,000 in unpaid wages after the Newbury contractor entered administration.
  • Helix Construct entered administration in September with £4.8m owed to suppliers, alongside £2.3m in bank and financier debt and £260,000 in unpaid staff pay. Its latest accounts, covering 18 months to June 2025, showed £40m turnover but growing cash and profitability pressure.
A conceptual editorial scene of a half-built low-rise housing site beside an empty site office, with stacked materials, a tower crane and blank document folders.

Helix Construct, a Newbury-based contractor, entered administration in September, and an update filed at Companies House by administrator KR8 Advisory Limited has set out the scale of the company’s unpaid liabilities.

The administrator reported that Helix owed £4.8m to suppliers, the largest of the creditor groups detailed in the update. The company also owed £2.3m to banks and financiers and £260,000 in outstanding pay to its 35 staff.

Latest accounts showed that the business had been under growing pressure on cash and profitability. Auditors also raised concerns about the valuation and recognition of profit on several contracts.

The accounts covered the 18 months to June 2025, when turnover reached £40m. That compared with £21m in the previous 12-month financial year, meaning the two figures cover different reporting periods and are not directly comparable.

Helix had been in business since 2017. It specialised in design-and-build construction for affordable housing, education, care and commercial projects across London and the south of England.

The disclosed liabilities cover suppliers, lenders and employees. The supplier debt is more than twice the amount owed to banks and financiers, while the unpaid wages represent a smaller sum. The figures were stated separately rather than as a single total, giving a breakdown of claims by type. The supplier claim remains the largest element in that breakdown.

Reported by Luciana Ferreira, Sustainable Specification and Property Lifecycle Analyst.